Originally posted by dbanner
View Post
Announcement
Collapse
No announcement yet.
SBG-PID
Collapse
X
-
Frequency changes for faster search and for work on high voltage lines.Meter is 0.5 mA.
Leave a comment:
-
-
PPS 373(99.1%) to PPS 624(98.5%).
Is audio tone independent of PPS? I don't think so.
Leave a comment:
-
Deselect C1. Copy and paste bottom layer(C2) and(S1) unto New board(by right clicking on Board 1) now top layer is completely removed from photoview. Zhirkov know this secret technique.Originally posted by 6666 View PostHow did you do that so fast ?
Sprint layout designer software is for dummies(KT315 always say this). Scanned copy feature is for "lazy dummies".
I simply retraced Sacho layout.
I will not be sharing the file. I am making my own layout, which I will share.
Leave a comment:
-
Hi Sashco, could you please tell me the specifications of the meter , thank you.
Leave a comment:
-
R6 is 1k.Pulse width is 22 microseconds. This is minimal TH power. If you want power increase R6. High power is harmful to human health.
Leave a comment:
-
Sashco, thank you for sharing the scheme, I have a question, R6 of 1K, is it correct? With this value, (1K), the pulse width of TX is around 22 microseconds.
Jos
Leave a comment:
-
I will send you the complete Sprint layout file when I'm finished with labeling the components.Originally posted by Andi68 View PostI am so glad, so glad, i am glad
Thenk you dbanner
I'll be posting the redrawn schematic soon. Even though the more I look at original schematic, the more I get use to it. It's fine as it is.
Leave a comment:
Leave a comment: